This
is a new
concept of wind turbines
evolved from conventional models.
GEDAYC
is a new concept of wind
turbines with blades and Kites 50% more efficient than propeller
models.
Thanks to its design and the wide range of wind that
generates energy
from weak to very strong winds.
The idea is to create a logistics company that manages the
design,
manufacture and sale of wind turbines of 500 KW GEDAYC whose innovative
design makes it equivalent in performance (KW / Year) siblings older
than 2 MW, due to its ability to generate power with winds weaker and
stronger than propeller models.
The idea of creating this design came from improving the
design of
current wind generators 3 shaft. We note as a single comet BOW model
covers the range of 5 wind windsurfing sails.
The BOW model comets belong to the new sport of kite surfing,
and
within the sport have brought a revolution because of its ease of use,
its wide range of wind that support, the possibilities of regulation,
more optimal design, and its ability to fly easily.
This led us to investigate advances in wind generators and
find only
more of the same, single-propeller turbine, propeller bi-,
tri-propeller, propeller curves etc, but always propellers, it was then
decided to install a blade and comets wind turbine.
The problems that have large wind turbines are their huge
size, its
excessive weight, high cost, limited range of work, the decibels they
generate, the problems at the end of a shovel, repairs, manufacturing,
transportation, maintenance, voltage peaks, the visual impact, bird
strike.
The wind speed in the world usually is 6 m/s and large wind
turbines
have their rated power from 12 m/s, GEDAYC has a design that would
enable its rated power is within 6 m/s with what we should Wind
Turbine cheaper and more efficient.
Gedayc (wind generator blades and comets) solves many of
these problems
and we are confident of success of this initiative which is based on
the manufacture of a turbine 5 times cheaper than current models, 5
times faster, 5 times easy to carry, 5
times easier to install, 5 times easier to fabricate, with 3
times the
range of work, almost equivalent in energy generation and much smaller.
They are wasting thousands of good locations for wind
turbines of
medium power, as only seeking land for giant wind turbines of 2 or more MW.
It is about making the world's largest wind turbine but the
most
efficient, capable of producing more KWh/year at lower cost.
We believe it is not necessary that the generators are so
large nor so
powerful, but smaller, more efficient, capable of generating power with
very weak winds to strong winds.
|